Work on the overhaul of the Barbican Centre was completed nearly two years ago. The changes to the building were significant – a new bridge was installed to connect Silk Street and Riverside entrances; bold graphics were used to sign each of the floors and main venues; and the pointillist walls and carpets were replacedContinue reading “School days at the Barbican Centre”
Daily Archives: 8 February 2011
A detail
Discovered at the foot of 80 Wood Street and London Wall are these two baby air vents that replicate exactly the large vents along the side of the building.