School days at the Barbican Centre

Work on the overhaul of the Barbican Centre was completed nearly two years ago. ┬áThe changes to the building were significant – a new bridge was installed to connect Silk Street and Riverside entrances; bold graphics were used to sign each of the floors and main venues; and the pointillist walls and carpets were replacedContinue reading “School days at the Barbican Centre”